Tip:
Highlight text to annotate it
X
[music]
>> Male voice-over: As water becomes Australia’s most critical resource, the need to deliver major water infrastructure projects that last –
on time and on budget – has never been more important.
Pentair Water Solutions is Australia’s leading manufacturer of water pipeline systems…
with expertise built and tested for more than one hundred years; operations across Australia; on-call support;
industry leading pipeline installation training; dedicated research and development; and flexible products –
Pentair is your pipeline partner for large scale, fast tracked projects.
High profile projects such as:
The South East Queensland Water Grid –
334 km of SINTAKOTE steel pipe in sizes ranging from 800 mm to 1450 mm.
Fast tracked by the Queensland Government, Pentair met all supply deadlines for this important project.
The Sunwater Burdekin to Moranbah Pipeline –
172 km of 813 mm SINTAJOINT RRJ and Spherical Slip-In welded joint steel pipe.
Pentair was able to deliver over 5.5 km of pipe per week.
The Goldfields Superpipe Ballarat Link for Central Highlands Water –
an 87 km pipeline with 47 km of 800 mm Sintajoint Steel pipe and 40 km of 750 mm Ductile Iron pipe.
Fast Tracked by the Victorian Government and delivered ahead of time and significantly under budget.
The Sugarloaf Pipeline for the Victorian Government –
a 74 km pipeline, with 51 km of 1750 mm and 23 km of 1400 mm diameter ball and socket Sintakote steel pipe.
This project is part of the modernisation of the Goulburn Valley irrigation network
which will save 425 billion litres of water each year.
The Victorian Desalination Project –
84 km of 1930 mm Ball and Socket Sintajoint pipe. The pipeline will deliver up to 150 billion litres of rainfall-independent
water a year… from the desalination plant in Wonthaggi to existing Melbourne and regional water networks.
South Australia Water Corporation’s Adelaide Desalination Plant at Port Stanvac –
a 12 km, 1500 mm Sintajoint steel pipeline taking 300 million litres of water to the Happy Valley Water Treatment plant.
Pentair’s Sintajoint pipe was selected to deliver the required 100 year design life.
This Sintajoint pipe enabled rapid construction speeds through the high pressure rubber ring joint technology.
The $40 million Harcourt Rural Modernisation Project for Coliban Water in Victoria –
Pentair delivered 19 mm of ductile iron pipes, valves and fittings.
Pentair’s 500 mm TYTONXCEL PN35 ductile iron pipe will be used to construct the backbone of the new rural pipeline system.
The Woleebee Creek to Glebe Weir Pipeline project for SunWater –
the second of its kind in Queensland, delivering up to 36,500ML of treated coal seam gas water annually to irrigation and
industrial customers. Pentair manufactured and supplied 120 km of 914 mm to 1400 mm steel pipe and fittings.
10,000 pipes and 3,500 steel fittings were delivered on time and on budget.
>> Damian Mackey, Pentair Vice President, Managing Director Water Transport: Pentair manufactures a range of pipes.
Including our premium pipe – the Sintakoted Steel Pipeline.
The technology that we use in that pipeline is world class.
>> The Hon. John Brumby, Former Premier of Victoria: I can’t think of another project which has been done so quickly,
on budget, so much ahead of schedule as this one and so to all of the companies, to all the contractors and employees – thank you.
[music]