Enter project specific information. Namely project name, location, development stage.
Enter estimated reserve including total ore and waste tonnes. Strip ratio will calculate automatically.
Enter commodity and estimated long-term price and grade. If more then one commodity, add by clicking below.
Estimate annual production, total material movement and engineering modifying factors including dilution and recovery.
Enter the proposed production ramp-up for initial three years if applicable.
Enter fixed costs (if available). This is typically comprised of salaries and overheads etc.
Enter the estimated mining and processing costs. User can enter more granular information if
Enter capital outlay including process plant, tailings facility, pre-strip etc.
The estimated metallurgical recovery is critical. More complex ore types generally result in lower recoveries.
Enter the royalty and corporate tax schemes relevant to the project.
Enter the discount rate which will determine the discount rate for the Net Present Value calculations.
Enter the estimated commodity price fluctuations for year-on-year and life of mine respectively.
Cashflow summary and key financial metrics are provided in a clean and simple format.
The gaussian distribution provides a good understanding of the impact of price volatility on the distribution of the predicted NPV.
The cashflow summary can be exported into CSV (Excel) format.