Tip:
Highlight text to annotate it
X
1. Dig your trench for the footing. Width and depth depends on the blocks you are using .
. Either at this level or your second course you may need to add your main drain line.
THE 2ND MOST IMPORTANT PART IS PROPER DRAINAGE. DO NOT FORGET IT.
Notice how straight that retaining wall was? Its Because of our Laser
We use the white string to make sure our blocks line up straight
We are using our Viber plate to compact the base rock
We are laying our footing and checking the level on each block..
Some retaining wall require Geo-grid. Adds strength to the wall.
We pride our self on building a retaining wall right the first time
IT"S SAFE TO SAY THIS WILL NEVER HAPPEN WITH OUR RETAINING WALLS