Tip:
Highlight text to annotate it
X
Today we're showing you how to properly assemble the Buzz Rack Bicycle Rack from Rage Powersports.
Parts for assembly include Cargo Bag, Front Tube Assembly, Rear Tube Assembly,Outer Side
Tubes, Inner Side Tubes, Mounting Brackets, Wheel Holders, Long Bolts & Spacers, Short
Bolts & Spacers, “L” Pins and 2- Pull Pins
Parts needed for Step 1 include Front Tube Assembly, Outer Side Tubes and 2 Long Bolts
and Spacers
To begin, Secure the Outer Side Tubes to the outer mounting holes on the Front Tube Assembly
using 2 Long Bolts and Spacers.
At this point keep bolts only finger tight.
Parts needed for Step 2 include Inner Side Tubes, 2 Short Bolts and Spacers
Mount the Inner Side Tubes to the inner mounting holes on the Front Tube Assembly using 2 Short
Bolts and Spacers.
At this point keep bolts only finger tight.
Parts needed for Step 3 include Rear Tube Assembly, 2 Long Bolts, 2 Short Bolts and
Spacers
Secure the Rear Tube Assembly to the Outer and Inner Side Tubes using two Long Bolts,
Two Short Bolts and Spacers.
Tighten all bolts including the bolts from the previous steps.
Parts needed for Step 4 include 2 Wheel Holders
To secure the Wheel Holders to the Rear Tube Assembly, loosen the mounting bracket under
the Wheel Holders and attach to the Rear Tube Assembly. Tighten bolts snugly.
Parts needed for Step 5 include Cargo Bag
The Cargo Bag easily mounts to the Buzz Rack frame using three buckles and two Velcro straps.
To attach the rear of the Cargo bag, wrap the rear buckle around the Rear Tube Assembly.
Once the clip is attached, pull on the strap to tighten up any slack.
The Velcro straps located on each side of the Cargo Bag attach to the Outer Side Tubes.
The front of the Cargo Bag attaches the same as the rear. Wrap the two front buckles around
the Front Tube Assembly. Once clips are attached, pull on the straps to remove any slack.
Parts needed for Step 6 include Mounting Brackets, 2 Pull Pins, 2 “L” Pins and U-Brackets
To attach the Mounting Brackets to the Front Tube Assembly, slide the mounting bracket
under the mounting point on the Front Tube Assembly. Align the mounting holes and insert
the pull pin.
Next we need to attach the rear Mounting Brackets to the Outer Side Tubes.
Slide the U-Brackets over the Outer Side Tubes and align the U-Bracket mounting hole with
the center hole on the Mounting Brackets. Insert the “L” Pin and lock the Mounting
Bracket in place.
Repeat this process for the next Mounting Bracket.
Thank you for watching this demonstration video on how to properly assembly the Buzz
Rack Bicycle Rack from Rage Powersports