Tip:
Highlight text to annotate it
X
My name is Eric Walkinshaw. I'm the Project Manager Civil Engineer here at Mount Rainier National Park
and we're at the Carbon River Entrance area
and we're involved in a project of installing about five log-constructed flood protection structures.
So it protects the entrance station to the park and some other facilities here in the park.
We hired the consultant to come in and they did the design work for us for these structures last October of 2010
and now we actually have a contractor on board: Mike McClung & Co., Construction Company
and they're constructing these structures for us
and Kirt's here to kind of oversee that part of the project to make some adjustments if they're needed on the structures.
Yeah, I'm Kirt Hanson, Engineer and Geologist with Cardno Entrix.
I'm excited to part of what I think is a historic project.
Engineered log jams have been around in ecologic and bank protection, flood protection systems
for going on probably close to twenty years- more likely fifteen-
and this is the first project where an engineered log jam has been installed inside of a National Park.
Eric: We, like I said, we're constructing a total of about five of these structures
one of which is called an engineered log jam, which is a more beefier structure
and that's on the leading edge just upstream, about a hundred yards from us.
It's basically to calm the water, to have some habitat,
but also in calming the water it drops out material that the river is carrying, mostly rock and silt.
So by doing that it kinds of builds up that area
so when the river floods again it forces it over more to the center of the channel
and away from our banks.
So that's the intent of that, but we had the advantage in this area
of having a natural log jam, which is kind of what you see back behind us
there is another one further down where the contractor is currently working.
So Entix designed these linear structures as kind of fences
on either side of those to kind of contain that.
What they didn't want to have happen- what we don't want to have happen-
is for those natural log jams to raise up and float and leave.
Cause they're in a good location that's protecting our facilities
but they needed the added help of putting in these structures
to kind of encapsulate it so it doesn't float away- Kirt: -to reinforce the existing log jams.
The first thing the contractor is taking care of is ground water
and McClung has done an absolute fantastic job of maintaining their de-watering systems.
That involves an initial excavation to a depth below the bottom of the structure
typically these initial excavations extend 17-18 feet below the ground surface to create a sump.
From that point, the ground water is pumped into a sedimentation system
where fine sediments are dropped out before being returned to the river.
The general, on this particular project, the general depth to the bottom of our excavation is about fifteen feet.
That's where these vertical piles, that you can see right behind me
that's the elevation that those are installed to: fifteen feet below the ground's surface.
This pile, here, is actually, it's probably about five and a half feet tall from where I'm standing
this is actually over a twenty-five foot pile.
So there's about twenty feet of log buried beneath my feet right here.
So following the installation of the vertical piles, there's an angled log that extends-
that log is about thirty-five feet long, extending back into the earth
also excavated to depth of about fifteen feet below existing pre-construction ground surface.
Following the installation of those, other horizontal members are added,
racking material out front to help control scour, and also create fish habitat, is installed
and final site grading completed.
This is an innovative design, designed to catch additional wooden debris coming down the channel
creating additional habitat, and providing additional stability
to the existing park structure and park entrance.
Eric: Basically all of our rivers are a lot like this.
We're having problems in other areas as far as getting a lot of deposition,
getting the river bed higher than our facilities, dealing with levees, dealing with-
we're going to be installing, especially on- hopefully on the success of these
which I'm really confident that these are going- I mean they are pretty beefy structures, I think they are going to do the trick-
and so we're going to use them a lot.
This is just really the first, as Kirt mentioned, this is really the first location that we've done it in earnest, these many structures.
So we're really going to be watching this and seeing how it performs
and I'm sure we're going to use it in a lot of other locations.