Patience is the key word and it can also give a headache ...
The aim is to check the connection between all the modules :
these black boxes containing the cells where power is stored.
There is a total of 80 interconnected modules.
Electricity, the energy which will be delivered to the engine of the Venturi VBB-3, is there in these boxes.
Ensuring that the current flows normally in each module is very important.
It moves through the network of connectors and cables.
These are also checked thoroughly, 1 by 1, to ensure that tension is good...
If it is not the case, the faulty cable or connector has to be changed .
Checking what is conventionally called « the battery » takes a whole week...
Once each piece is approved, the assembly can begin.