Good morning girls and boys!
Today I 'm writing from the only remaining
remaining landfill in Vienna.
This landfill must be even,
because it arose before the new
Legislation. The new legislation states
that in Vienna must not be more landfill.
This landfill will continue to maintain
to pull this out of the garbage landfill gas
and with the landfill gas is then passed through combustion
Generates heat. In addition to district heating can then also generate electricity.
We behold the day of
and I hope you can see here how it works.
Landfill Rautenweg as a model
Speaker: to beat gas wells, which are the
Collection points are distributed on the site.
The gas wells collect this landfill gas.
Thus lie on a manifold and the main lines,
we have 6 main lines and come here
to this compressor station and here is a
Applied negative pressure by a rotary compressor,
that is, which is sucked.
The entire landfill gas wells suck practically
from the landfill body.
So this generated landfill gas.
So we have 150 such gas wells,
we even had up to 200, then of course
if one sucks is that measured at each gas well
how much landfill gas to bring some areas.
Some areas are not as productive,
because you get nothing out more
then be removed from the network down.
The danger is indeed the one I then
mutual aspiration of Depoiegases do.
In E-Car to tour around the Landfill
Unfortunately, a very windy day and the speaker does not speak very loud
Speaker: If you listen to me?
We also have a location of refuse collection vehicles,
that is, about 100 vehicles are stationed here.
Come in the morning and then drive away,
now the private cars are here.
The are of course on tour in the afternoon they come back then usually,
at 14h after the day's work done.
Here you can see a car wash, which is also relatively new here.
Where our cars, our refuse collection vehicles to be washed.
Here is the birthplace house.
Each entrance to the landfill is weighed here
Previously this was so, because if a private person has come
there has been an apparent control.
Weighing house and weighing plate
Vehicles entering to be weighed here
and at the exit back to the
Be able to determine the difference.
Speaker: That is still a camp.
We used the gravel has been turned around in the spring,
washed here. We do not now,
because we have less capacity.
Ride-on: How many refuse collection vehicles there are in Vienna?
Speaker: Refuse collection vehicles? Well, there are about 265 waste collection routes.
Since everything is now in the process, paper, plastic and residual waste.
The police keeps on big vans because
they suspect that he is overweight and avail
then our scales. We're an official scale
for weighing and is often used by the police.
Road noise from the access road Rautenweg
Biogas compression station, not biogas
but landfill gas compression station.
From here, via high pressure lines
brought the landfill gas to the engines
to generate electricity there.
Instead of 2 large engines with 660 kW are
Now 3 Small with 330 kW.
Speaker: With this slope, there are also problems with the greening.
There are also tested different seed mixtures
what wash is best, fastest wash.
Since the left (of me from right), we have the two
new engines, no 3.
The plant you see was from the
Company provided Steinerbau available
so you just look like the looks.
The old 660 kW motor.
These are real gas engines Frima Jenbacher.
Passenger: Are the old gas wells or a water pipe?
Speaker: No, that is an old gas line,
that has been cut and was re-laid.
The red and white bars you see are water points.
This has been requested by the fire department.
An old garbage drum for compost before the
has disposed of, one has the refurbished and used as a passage.
In the summer we have the Vienna holiday play here
where children come and we show them something.